Pine Knoll Shores Bogue Sound Watershed Restoration
Pine Knoll Shores sits between the maritime forest and the Atlantic, but it is the sound side of town that has gotten the most attention in recent years. Bogue Sound, the shallow estuary that separates Bogue Banks from the North Carolina mainland, has been dealing with water quality problems that have permanently closed some shellfish beds and triggered swimming advisories at sound-side access points across the Crystal Coast. Pine Knoll Shores is doing something about it.
The Problem: Stormwater and Bogue Sound
For roughly 40 years, Pine Knoll Shores managed stormwater the way most coastal towns did: pump it out as fast as possible. When it rained, the town’s drainage system collected surface water from roads, driveways, and rooftops and pumped it directly into the nearest waterway. The problem is what that water carried with it.
Stormwater runoff on a barrier island picks up everything on the ground surface: fertilizer from lawns, oil from parking lots, bacteria from septic systems, and sediment from disturbed soil. When that runoff gets pumped straight into Bogue Sound, it degrades water quality to the point where the state has to close shellfish beds and issue swimming advisories.
The result has been permanent shellfish closures in portions of Bogue Sound near Pine Knoll Shores. Areas that were once productive for oystering and clamming have been classified as too polluted for harvest. NC DEQ has issued swimming advisories at sound-side sites in Carteret County when bacteria levels exceeded safe thresholds, including advisories near the Atlantic Beach High-Rise Bridge in Bogue Sound in May 2025 and at several Morehead City sound-side access points in 2025 and 2026.
The Pine Knoll Shores Watershed Restoration Plan
In response, the Town of Pine Knoll Shores partnered with the North Carolina Coastal Federation and the University of North Carolina Wilmington’s Environmental Science Department to develop a formal watershed restoration plan. The plan, completed in early 2019 and submitted to NC DEQ as a Nine Elements Watershed Restoration Plan, lays out a strategy to reduce stormwater pollution and work toward reopening closed shellfish beds.
The core idea is simple: instead of pumping polluted stormwater directly into Bogue Sound, find ways to slow it down, filter it, and let it infiltrate into the ground before it reaches the water.
What Pine Knoll Shores Has Built
The watershed restoration plan is not just a document. Several projects have been constructed:
The Groundwater Management System
The eastern side of Pine Knoll Shores had chronic flooding problems dating back to 2014. The town worked with the NC Coastal Federation to install a groundwater and stormwater management system that uses perforated pipes and pumps to draw down the water table before storms hit. This increases the ground’s capacity to absorb rainfall instead of sending it straight to the sound.
Where does the water go? It gets pumped to the Crystal Coast Country Club golf course pond for storage. A second phase of the project enhanced the system so that stormwater can be temporarily held in golf course ponds that drain through a sand filter, designed to look like a sand trap. The filtered water is clean enough that it does not pollute the sound when it eventually reaches it.
Funding for this phase came from a $259,000 grant from the NC Clean Water Management Trust Fund, with additional support from the NC Land and Water Fund.
Permeable Pavers at Acorn Court
Acorn Court, a cul-de-sac in Pine Knoll Shores, flooded chronically during storms. The town replaced the impervious pavement with permeable pavers designed to absorb approximately 100,000 gallons of rain for every 3.4 inches of rainfall. The project included an underdrain system and force main to a canal, with the entire cul-de-sac repaved.
Instead of rain hitting hard pavement and running off into the nearest drain, it now soaks through the paver surface and infiltrates into the ground below. This is funded by the NC Attorney General’s Environmental Enhancement Grant Program.
Why This Matters for Pine Knoll Shores Visitors
You might be wondering what a stormwater management plan has to do with your vacation. Here is the connection:
Sound-side activities depend on water quality. If you want to kayak through the salt marshes, paddleboard on Bogue Sound, or watch dolphins from a sound-side dock, the health of Bogue Sound directly affects your experience. Cleaner water means more wildlife, healthier seagrass beds, and fewer swimming advisories.
Shellfish harvesting could expand. If the watershed restoration work succeeds in improving water quality enough to reopen currently closed shellfish beds, recreational oystering and clamming areas in Bogue Sound could expand. Combined with the recent expiration of the commercial shellfish lease moratorium in Bogue Sound, the future for shellfish in these waters looks better than it has in years.
The maritime forest is part of the solution. Pine Knoll Shores’ maritime forest is not just a beautiful place to walk. It is a natural stormwater filter. The tree canopy catches rainfall, slows it down, and gives it time to infiltrate into the sandy soil instead of running off the surface. This is one reason Pine Knoll Shores has been deliberate about conserving its forest cover and limiting development that removes trees.
The Bigger Picture on the Crystal Coast
Pine Knoll Shores’ watershed restoration work is part of a larger effort to improve Bogue Sound’s water quality across the Crystal Coast. The sound is a shared resource that every town on Bogue Banks depends on. Stormwater management in Pine Knoll Shores helps the entire system.
The NC Coastal Federation, one of the key partners in this work, operates across the state’s coast and has been particularly active in Carteret County. Their approach focuses on nature-based solutions - living shorelines, restored oyster reefs, and stormwater infiltration - rather than engineered concrete infrastructure.
For visitors who care about the environmental health of the places they visit, Pine Knoll Shores is doing the work. The town has always been the nature-focused community on Bogue Banks, home to the NC Aquarium, Theodore Roosevelt Natural Area, and some of the best-preserved maritime forest on the Crystal Coast. The watershed restoration plan is an extension of that identity: a commitment to keeping the natural systems that make Pine Knoll Shores special healthy for the long term.